AMIRA’s stadium lighting masts at the stadium in Perm

The multifunctional sports complex “Energia” has opened in Perm. This is the largest sports facility built in Perm in recent years. The priority project was implemented within the framework of the Perm-300 infrastructure program and the Demography national project.

Two universal sports halls are located on four floors of the complex, among them the first handball hall in the Kama region. In addition, there is a swimming pool with a medical rehabilitation complex, a gym and fitness rooms, martial arts and boxing halls, and tennis courts on the roof in use. The sports complex has a stadium with running tracks, a football field with bleachers, running tracks and exercise equipment.

25-meter AMIR sports masts with stationary lighting crowns were installed at the stadium.

The masts of the VMON series are made of sheet steel by bending with several longitudinal welds. They consist of several sections that are connected to each other by a telescopic connection. The upper section is crowned with a flange, on which a platform for placing lighting devices is installed.

We are sure that Permians will appreciate the result of our work.

For detailed advice on the selection of equipment:

8-800-775-25-05
amira@amira.ru